Getting your construction fire safety plan approved the first time requires more than filling in a template — it requires knowing exactly what BC fire departments look for during their review. Here’s a detailed breakdown of the most common review criteria and the issues that lead to rejection.

The Review Process

When you submit a construction fire safety plan, it goes to the fire prevention office of the local fire department. A fire prevention officer (FPO) reviews the plan against the BC Fire Code requirements and the department’s own submission standards. The review typically takes 3–10 business days, depending on the municipality and their workload.

If the plan is compliant, the FPO stamps and approves it. If there are deficiencies, you’ll receive a notice listing the required changes — and the clock starts again.

What Fire Departments Check

1. The CAD Site Plan

The site plan is the most scrutinized element of any construction fire safety plan. Fire departments look for:

Plans that use hand-drawn sketches, satellite imagery overlays, or modified floor plans instead of proper CAD drawings are frequently rejected or flagged for revision.

2. Emergency Procedures

Fire departments want to see that your plan addresses real scenarios, not generic descriptions. Common deficiencies include:

3. Hot Work Procedures

Hot work is closely scrutinized because it’s a leading cause of construction fires. Reviewers check that:

4. Fire Suppression Equipment

Plans must specify extinguisher types (typically 2A-10BC rated minimum), quantities based on site area, and placement. Many reviewers apply a maximum travel distance rule — the nearest extinguisher should be reachable within 23 metres from any point on the site. Under-specifying extinguisher quantities is a very common deficiency.

5. Site Superintendent Information

The plan must identify a named individual responsible for fire safety on site — typically the general superintendent. Some fire departments require contact information for two individuals in case the primary contact is unavailable. Generic titles without names are frequently flagged.

Municipality-Specific Requirements

Beyond the BC Fire Code baseline, individual fire departments have their own requirements. Vancouver Fire Rescue Services requires the CFSD appointment form with each submission. Surrey Fire Service has specific access route documentation requirements. North Vancouver has requirements related to fire department notification procedures for occupied adjacent buildings.

This is why copying a plan from a previous project in a different municipality — even if that plan was approved — often results in rejection.

How Get Fire Plan Achieves a 100% Approval Rate

Our team prepares plans daily for BC fire departments and knows exactly what each department’s reviewers look for. We prepare site-specific CAD drawings to proper scale, complete all required sections based on your municipality’s current standards, and include all required forms and attachments in each submission. We provide a draft for your review before submitting, and we handle all deficiency responses at no additional charge.

Ready for a plan that gets approved the first time? Contact Get Fire Plan for a quote.

Need a construction fire safety plan?

Firm quote within one business day, drafts in 5–7 business days, no site visit required, approval guaranteed — anywhere in BC.

Guides: BC Fire Code requirements · What a CFSP costs · How long it takes · What a plan must include

Need a fire safety plan for an existing building? Visit our sister site: getfireplan.com