778-574-2895   |   Free Quote

If you’re breaking ground on a construction project in Surrey, BC, you need a Construction Fire Safety Plan (CFSP) before work begins — no exceptions. Surrey is one of the fastest-growing cities in Canada, with nearly 6,300 new homes permitted and over $2.8 billion in construction activity in 2024 alone. The Surrey Fire Service reviewed 164 Construction Fire Safety Plans in 2024, and enforcement is active.

This guide covers exactly what the City of Surrey requires, what your CFSP must include, how to submit it, and what it costs.


What Governs Construction Fire Safety Plans in Surrey?

Surrey does not have a standalone CFSP bylaw. Requirements come from a layered framework:

Surrey enforces the BC Fire Code as written, with its own supplementary forms and submission process layered on top.

Note: Projects that received building permits before March 8, 2024 are governed by the 2018 BC Fire Code. Contact Surrey Fire Service if you’re unsure which version applies to your project.


When Is a CFSP Required in Surrey?

Every construction, alteration, or demolition project that requires a building permit needs a CFSP. The BC Fire Code does not set a minimum building size or project value — the requirement applies broadly. Surrey enforces this for all permitted projects.

The CFSP must be approved before construction begins. It is not something you prepare partway through the project. Surrey’s Fire Prevention Division must review it, and the review fee must be paid before the review even commences.

Projects With Enhanced Requirements

Certain project types trigger additional obligations on top of the standard CFSP:

Project Type Additional Requirement
Buildings over 3 storeys Charged standpipe extension required, extended progressively with construction
Buildings over 6 storeys (high-rise) Additional evacuation/notification requirements; contact highrise@surrey.ca directly
Wood frame / combustible construction 24/7 continuous fire watch required from the time combustible framing commences
Occupied portions adjacent to construction Fire watch with tours at maximum 1-hour intervals unless a fire alarm system is in place
Large wood-frame projects (adjacent properties at risk) A Protection of Adjacent Properties Report stamped by a Fire Protection Engineer may be required

What Must Be in a Surrey Construction Fire Safety Plan?

Surrey has its own required forms and content standards. A generic CFSP template will not pass Surrey Fire Service review. Here is what must be included:

1. Site Information and Contacts

2. Site Plan — Surrey-Specific Symbol Requirements

Surrey requires that your site plan use Surrey Fire Service’s standardized Site Plan Symbols. Your drawing must show:

Using non-standard symbols or a generic drawing is a common reason for plan rejection.

3. Fire Protection Equipment Plan

4. Emergency Procedures

Written emergency procedures must address:

All workers must be orientated to the site plan before starting work, and regular fire safety toolbox talks are required throughout the project.

5. Hot Work Permit System

Hot work (welding, grinding, cutting, torch work) is one of the leading causes of construction site fires. Surrey requires a written hot work permit for every hot work operation, covering:

6. Combustibles and Housekeeping

7. Fire Watch Requirements

Fire watch is one of the most misunderstood aspects of Surrey construction fire safety compliance. Here is when it applies:

24/7 continuous fire watch is required once combustible (wood frame) construction begins. This means a qualified, dedicated person — whose only job during their shift is fire watch — must be on site at all times.

This is not optional, and it is not satisfied by a general site supervisor checking in occasionally.

Where an occupied portion of a building is adjacent to construction activity, a fire watch with tours at maximum 1-hour intervals is required unless a permanent fire alarm system covers both areas.

8. Water Supply

An adequate water supply for firefighting must be available as soon as combustible material arrives on site. A temporary supply is acceptable until the permanent hydrant system is installed, but you cannot place combustible materials on site without fire suppression water available.


Surrey-Specific Submission Forms

Every CFSP submitted to Surrey must include:

  1. Surrey Vital Building Information Sheet — Surrey’s own form capturing key site and building data for responding firefighters
  2. Surrey Site Plan Symbols — Standardized symbol legend that must be used on your site drawing
  3. Form 092 — Fire Safety Plan Review (2024 version) — Surrey Fire Service’s official review form

These forms are available through the Surrey Fire Service. Missing any of these will delay your review.


How to Submit a CFSP in Surrey

Surrey runs two submission tracks:

Track 1 — Approved CFSP Companies: Companies on Surrey’s approved list submit directly through the Surrey Fire Service online portal. This is the fastest route.

Track 2 — All Others: Email fsp@surrey.ca to initiate the process. A Fire Prevention Officer will contact you to arrange submission. Do not submit your plan documents without first making contact.

For high-rise projects (6+ storeys), use the dedicated email: highrise@surrey.ca

Surrey Fire Service — Fire Prevention Division
Address: 8767 132 Street, Surrey, BC, V3W 4P1
Phone: 604-543-6780
Email: fsp@surrey.ca


Surrey CFSP Review Fees

Review fees must be paid before the review begins — Surrey Fire Service will not start reviewing your plan until payment is received. Effective May 7, 2024:

Project Type Fee (+ GST)
Non-high-rise — first 2 hours (minimum charge) $232 + GST
Non-high-rise — over 2 hours $116/hour + GST
High-rise / care facility / detention — first 3 hours (minimum) $347 + GST

Complex plans with multiple phases or large sites often exceed the minimum review time.


How Long Does CFSP Approval Take in Surrey?

Surrey Fire Service does not publish a guaranteed turnaround time. Given that the division reviewed 164 CFSPs in 2024 alongside 282 building permit reviews and over 8,000 property inspections, review queues can be significant during peak construction season.

Practical advice: Submit your CFSP early — ideally 2 to 4 weeks before your intended construction start date. Incomplete submissions (missing the Vital Building Information Sheet, incorrect site plan symbols, missing Form 092) restart the clock.


Common Reasons Surrey Rejects or Delays CFSP Submissions


What Happens If You Don’t Have a CFSP in Surrey?

Surrey Fire Service has authority under the BC Fire Code and Surrey’s own bylaws to issue a stop-work order if a required CFSP is not in place. Penalties for BC Fire Code violations can include fines. More practically, operating without a CFSP puts your workers, neighbouring properties, and your project financing at risk — most construction lenders and insurers require a valid CFSP.


Need a Construction Fire Safety Plan for a Surrey Project?

Our team prepares Construction Fire Safety Plans for projects across Surrey and the Lower Mainland. We know Surrey Fire Service’s requirements — including the Vital Building Information Sheet, Form 092, and standardized site plan symbols — and we prepare plans that pass review.

We handle the full process: site assessment, CAD site plan, Surrey-specific forms, submission coordination, and updates through each construction phase.

Get a quote for your Surrey CFSP →

We work with general contractors, developers, owner-builders, and project managers. Most plans are completed within 5 to 7 business days.


This article was prepared based on the BC Fire Code 2024, Surrey Fire Prevention Bylaw No. 10771, Surrey Fire Service guidance documents, and Surrey’s 2024 Annual Report. Requirements may change — confirm current requirements directly with Surrey Fire Service at 604-543-6780 before relying solely on this article.

Need a construction fire safety plan in Surrey?

Firm quote within one business day, drafts in 5–7 business days, no site visit required, approval guaranteed — anywhere in BC.

Guides: BC Fire Code requirements · What a CFSP costs · How long it takes · What a plan must include

Need a fire safety plan for an existing building? Visit our sister site: getfireplan.com