In Richmond, BC, a Construction Fire Safety Plan (CFSP) is not just best practice — it is a legal requirement before your building permit will be issued. Richmond Fire-Rescue takes construction fire safety seriously, and their plan review process is designed to ensure that construction sites protect workers, protect neighbouring properties, and provide proper access for first responders.

This article covers everything you need to know about Richmond’s construction fire safety plan requirements: what triggers the requirement, what must be in your plan, how to submit it, and what the fees are.

The Legal Basis

Construction fire safety plans in Richmond are required under two sets of rules:

  1. BC Fire Code 2024, Section 5.6 — the provincial standard governing fire safety during construction and demolition across BC
  2. City of Richmond Fire Protection and Life Safety Bylaw No. 8306 — Richmond’s municipal bylaw, which makes compliance with the CFSP requirement a local legal obligation

Failure to obtain an approved and registered Construction Fire Safety Plan is a violation of both the BC Fire Code and Bylaw No. 8306. Richmond Fire-Rescue can apply cost recovery fees for emergency services to non-compliant construction sites where a fire or incident occurs — adding significant financial risk on top of the regulatory penalties.

When Is It Required?

Richmond Fire-Rescue requires a Construction Fire Safety Plan for all buildings or portions of buildings under construction or alteration — as defined by the BC Building Code and BC Fire Code Regulations. The requirement applies broadly:

The key trigger is the building permit. Richmond Fire-Rescue requires the CFSP to be submitted, reviewed, and accepted before the building permit is issued. This means your fire safety plan is part of the pre-construction approval process, not an afterthought.

What Must Your Plan Include?

Richmond Fire-Rescue has detailed content requirements for Construction Fire Safety Plans. Your plan must address:

Written Procedures and Personnel

Site Access and Visibility

Fire Hazard Controls

Richmond specifically requires written procedures for controlling the following hazards:

Fire Protection Equipment

Site and Floor Plans

Your CFSP must include proportional site plans and floor plans drawn to an indicated scale, showing:

How to Submit Your Plan

Richmond Fire-Rescue requires that CFSPs be submitted electronically by the owner, registered co-ordinating professional, or their designated representative.

Submission methods:

Format: WORD or PDF

Mailing address:
Richmond Fire-Rescue Department
Fire Prevention Office
6960 Gilbert Road, Richmond BC V7C 3V4

📞 Phone: 604-278-5131
📧 General email: fire@richmond.ca

Richmond Fire-Rescue recommends that plans be “designed, developed and submitted by a qualified and experienced fire safety planning contractor” — a reflection of the technical detail required for approval.

Richmond’s Fee Schedule

Richmond uses a fee schedule based on building footprint area, scaling appropriately by project size:

Project TypeFee (+ GST)
Buildings under 600 m²$135.00
Buildings over 600 m²$197.00
High-rise or institutional buildings$261.00
Plan revisions (per occurrence)$65.25

Fees based on 2023 rates from Richmond Fire-Rescue guidelines. Contact the department to confirm current rates.

After Approval: On-Site Requirements

Once Richmond Fire-Rescue reviews and approves your Construction Fire Safety Plan:

Richmond Fire-Rescue may conduct site inspections to verify compliance with the approved plan. If conditions change significantly — new personnel, different access routes, phase transitions — your plan should be updated and re-submitted for approval.

Hot Work Permits

Any hot work on your Richmond construction site requires a hot work permit before work begins. Hot work includes welding and cutting, grinding and abrasive operations that produce sparks, open flame operations, and brazing and soldering.

Your CFSP must outline the hot work permit system, and the site supervisor must ensure permits are issued and kept on file, and that fire watch procedures are followed. A fire watch should be maintained during hot work and for a minimum period after completion.

Who Should Prepare Your Richmond CFSP?

Richmond’s content requirements are thorough, and the plan review process is conducted by experienced fire prevention officers. Incomplete plans — those missing required personnel contacts, lacking proper site plans, or using generic template language — are returned for revision, which adds time and can delay your building permit.

Given that the plan must be submitted and accepted before the building permit is issued, there is no buffer for multiple revision cycles on a time-sensitive project. A professionally prepared plan — genuinely specific to your Richmond site — moves through the review process efficiently.


Get a Richmond Construction Fire Safety Plan

Get Fire Plan prepares Construction Fire Safety Plans for construction projects throughout Richmond and the Lower Mainland. Our plans meet Richmond Fire-Rescue’s specific submission requirements and content standards.

👉 View our Richmond construction fire safety plan services →

📞 778-574-2895 | contactus@getfireplan.com

Need a construction fire safety plan in Richmond?

Firm quote within one business day, drafts in 5–7 business days, no site visit required, approval guaranteed — anywhere in BC.

Guides: BC Fire Code requirements · What a CFSP costs · How long it takes · What a plan must include

Need a fire safety plan for an existing building? Visit our sister site: getfireplan.com